Documenting testing procedure

This commit is contained in:
Skylar Grant 2022-12-18 20:30:25 -05:00
parent ca333e5603
commit 74b8ee69cc

View File

@ -45,3 +45,12 @@ For ease of adaption, connection, and prototyping I've decided to use Cat 5 ethe
* v0.2 - Implement safety switches and put the igniter and combustion blowers on relays controlled by the Pi. * v0.2 - Implement safety switches and put the igniter and combustion blowers on relays controlled by the Pi.
* v0.3 - Implement the HTTP module to allow controlling the stove from the LAN. * v0.3 - Implement the HTTP module to allow controlling the stove from the LAN.
* v0.4 - Implement usage logging with a SQL database. * v0.4 - Implement usage logging with a SQL database.
# Testing Procedure
1. Launch app, check startup messages, check that it idles and pauses properly.
2. Provide ignite command, observe if the igniter, blower, and auger get turned on. Make sure the igniter turns off after the pre-set time.
3. Test that the following conditions cause a shutdown:
* Proof of Fire Switch OPEN after igniter shutoff.
* Vacuum Switch OPEN after igniter start.
4. Test manipulation of feed rates.
5. Test shutdown sequence.